Also known as Arundel Great Court, One The Thames is a prestigious riverfront development comprising two residential towers and a hotel complex. Situated on the bend of the River Thames’ north bank, it offers unrivalled views of the river and a handful of London’s most historic buildings.
We initially constructed a substructure and superstructure reinforced concrete frame while managing the completion of underground drainage lightning protection systems. When Carillion went into compulsory liquidation in January 2018, we were appointed Principal Contractor, completing the substructure and superstructure of all three buildings.
Structures
Complex Work
02
More than one area required complex work. Our sophisticated temporary works solution to secure the existing external walls and roads during excavation was designed in-house. A similarly complicated temporary works support system was needed for the adjoining roads around the site perimeter, which was left partially in place until the construction of the ground floor over B1, B2 and B3.
Finally, the site’s location next to the River Thames meant considerable dewatering was required. The basement to B2 and the external walls to the ground floor were cast using waterproof concrete.
Community Consideration
03
As the site was located in a prominent place opposite Temple tube station and alongside Kings College University, collaborating with local authorities and organisations was crucial. We worked closely with Westminster Council to ensure minimal disruption during deliveries and carried out significant refurbishment works at the nearby Oasis City Farm as part of our commitment to the community.
04
05
06
click to open
Community Consideration
03
As the site was located in a prominent place opposite Temple tube station and alongside Kings College University, collaborating with local authorities and organisations was crucial. We worked closely with Westminster Council to ensure minimal disruption during deliveries and carried out significant refurbishment works at the nearby Oasis City Farm as part of our commitment to the community.
04
05
06
07
07
click to open
Community Consideration
03
As the site was located in a prominent place opposite Temple tube station and alongside Kings College University, collaborating with local authorities and organisations was crucial. We worked closely with Westminster Council to ensure minimal disruption during deliveries and carried out significant refurbishment works at the nearby Oasis City Farm as part of our commitment to the community.
04
05
06
07
08
06
06
click to open
Community Consideration
03
As the site was located in a prominent place opposite Temple tube station and alongside Kings College University, collaborating with local authorities and organisations was crucial. We worked closely with Westminster Council to ensure minimal disruption during deliveries and carried out significant refurbishment works at the nearby Oasis City Farm as part of our commitment to the community.
04
05
06
07
08
09
10
Community Consideration
03
As the site was located in a prominent place opposite Temple tube station and alongside Kings College University, collaborating with local authorities and organisations was crucial. We worked closely with Westminster Council to ensure minimal disruption during deliveries and carried out significant refurbishment works at the nearby Oasis City Farm as part of our commitment to the community.